1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.
Mould material | Plastic mould material: SP20 steel, 718, 2738,H13, NAK80,1.2344,2343,S136,etc.... |
Fast mould design | We can be within 1-3 working days after getting customer's drawings. |
Lead time | Plastic moulds: 2- 7 weeks after getting the mould design confirmation. |
Mould testing | All of the moulds can be well tested before the shipments. Videos testing the moulds are available. |
Minimum order | Small orders can be accepted. |
Production capacity | 45-50 sets/month. |
Port | Shanghai |
Runner | Hot/cold runner, sub gate/edge gate /cow horn gate…etc |
Payment terms | L/C T/T Western Union MoneyGram. |
Mould making service | Mould Tool Manufacturing/Plastic Injection Moulding and OEM Services/Rapid Prototyping and 3D Printing/Secondary Operations |
After-sales service | Life-long gurantee. |
Safe packing | In strong wooden pallets to avoid any damages during long transportation. |
Why Customers Choose Us?
We have been engaged in this field for 15 years, we've served customers from the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries. |
Professional Certification |
Quality control and technology improvement |
•ISOIS09001:2000 |
•SGS certificate |
•The complete quality control system. |
Precision durable mold |
•3 CNC: Precision 0.005mm |
•1 Three dimension:1Precision 0.001mm |
•1 wire drive slowly: Precision 0.002mm |
•2 Mirror discharge: Precision 0.005mm |
100% Guaranteed Quality |
•100% tested(Not Just Batch Tested) |
•SOP standard production |
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) |
•10 professional quality control inspectors |
Competitive price and service |
•Delivery time: 2-3 Weeks after order |
•Provide new design for customers' requirements |
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video. |
•Free provided sample. |
•10-20% cheaper than other competitors |
•Return the entire mould cost if you order 500,000pcs product. |
•Life-long guarantee period, which is much longer among this field. |